wangsa-maju.com Neighbourhood guide (home)
+6013-3398686 Enquire

LRT Kelana Jaya Line · Station guide

Sri Rampai station

The fourth station on the Kelana Jaya Line. Work began in 1996, stopped in 1997 and resumed in 2008, and the station opened only on 24 December 2010: for more than ten years, trains ran through here with nowhere to stop.

Map: © OpenStreetMap contributors (ODbL), snapshot of 16 October 2026. The dashed circles mark straight-line distances of 400 m and 800 m from the station; they are not walking routes.

  1. KJ1 Gombak
  2. KJ2 Taman Melati
  3. KJ3 Wangsa Maju
  4. KJ4 Sri Rampai
  5. KJ5 Setiawangsa
  6. KJ6 Jelatek
  7. KJ7 Dato' Keramat
  8. KJ8 Damai
  9. To Putra Heights (KJ37)
LRT Kelana Jaya Line, KJ1–KJ8: a diagram drawn in the operator’s published station order. Not a map, not to scale.

The short answer

Sri Rampai is KJ4 on the LRT Kelana Jaya Line, between Wangsa Maju (KJ3) and Setiawangsa (KJ5). According to Prasarana’s 2010 statement, work began in 1996 and was halted in 1997, because development around the site was delayed and few people lived there; it resumed in September 2008, and the station opened on 24 December 2010. It is a two-level at-grade station, with its two side platforms below ground level.

Station code
KJ4Kelana Jaya Line
Opened
201024 December
Next station north
Wangsa Maju (KJ3)
Next station south
Setiawangsa (KJ5)

Compiled by Kevin LeeUpdated

What the operator publishes

A station more than ten years late

According to Prasarana’s statement of 22 December 2010, work on the station began in 1996 and was halted in 1997, because development around it had been delayed and few people lived in the area. Work resumed in September 2008 and was completed in early December 2010, and the station opened to the public on Friday, 24 December 2010.

The same statement describes a two-level at-grade station: two side platforms below ground level, with the rest of the structure above ground. At opening it listed escalators, lifts, CCTV, tactile guide tiles, passenger benches, a surau, and a covered walkway to the Desa Putra condominium.

Sources: Prasarana statement of 22 December 2010 (via TRANSIT) (2010-12-23)

Line news

What has happened on this stretch lately?

  1. 13 October 2026

    The operator admits incidents are up this year

    Prasarana said the Kelana Jaya Line’s incident rate for January to August 2026 was about 30% worse than in the same months of 2025, mainly because the trains’ automatic emergency brakes were being set off.

    Sources: Bernama: Prasarana on reliability in 2026 (2026-10-13)

  2. Sep–Oct 2025

    Signalling upgrade tests

    During phase two of the 2025 signalling upgrade, the ten stations from KLCC to Gombak, Wangsa Maju and Sri Rampai among them, opened only at 9am on test days, with shuttle trains and free buses filling the gap.

    Sources: New Straits Times: Kelana Jaya Line signalling upgrade (2025-07-28); Sin Chew Daily: Kelana Jaya Line signalling works extended (2025-08-07)

  3. 15 October 2024

    Rainwater pours onto the at-grade track

    At about 10.20am, an unusual flow of rainwater entered the at-grade track between Wangsa Maju and Sri Rampai and damaged some track components. After temporary repairs and testing, full service resumed at 3.30pm.

    Sources: Bernama: Kelana Jaya Line services resume (2024-10-15); The Star: floods disrupt the Kelana Jaya LRT (2024-10-15)

  4. 24 December 2010

    The station opens

    Fourteen years after work began, Sri Rampai station opened to the public.

    Sources: Prasarana statement of 22 December 2010 (via TRANSIT) (2010-12-23)

For the whole line’s history and the new trains, see the Kelana Jaya Line.

Talk

A question about this station?

What it’s like to live nearby, or which exit to use: just ask.

  • WhatsApp Kevin Lee WhatsApp opens with a draft message. Nothing is sent until you tap send.
  • Leave Kevin a message

    A Malaysian mobile number, e.g. 01X-XXX XXXX. Kevin replies to this number.

    What would you like to know?
    More details (optional)

    Your details are used only to reply to this enquiry. The form is processed by a service provider based in the United States (Formspree). The privacy notice explains how your details are handled and kept.

  • Call +6013-3398686

KEVIN LEE李明伟

13 years in real estateSenior Property AdvisorREN 14973

Affiliated agency: FLP REALTY SDN. BHD.

Ask me anything, directly. In English, Bahasa Malaysia or Chinese.

kevinlee.com.myMeet Kevin Lee and his team

Name on REN tag LEE BENG WAI· REN 14973· FLP REALTY SDN. BHD. (estate agency reg. E (1) 1718; company no. 1193823-D; office tel. +603-7499 2575)· Mobile +6013-3398686

WhatsApp

Image

Drag to look around · Double-click or pinch to zoom · ← → to switch · Esc to close